This is how decoration masters are trained. Learn

2022-07-22
  • Detail

1. The tools are in place and ready. Before decoration, several things that must be prepared are put in your bag. Tape measure (5m), calculator, large board clamp (for clamping lists and receipts). In addition, it is best to prepare old towels (soft cotton ones, for wiping bricks after pasting bricks) at the construction site in advance Plastic bags (wrapped around the pipe interface to prevent dirt from blocking. 2. Choose a auspicious day and start shooting. Before the workers enter the site, it is best to measure the corners of the home personally, take a pen ruler and write it down...

1. Tools are in place and ready

before decoration, you must put several things ready in your bag. Tape measure (5m), calculator, large board clamp (for folder and receipt), in addition, It's best to prepare old towels (soft cotton ones, for wiping bricks after pasting bricks) at the construction site in advance plastic bag (wrap it around the pipe interface to prevent dirt from blocking.

2. Choose a auspicious day and start shooting.

before the workers enter the site, it is best to measure the corners of the home in person, take a pen ruler and mark them clearly. Clarify the area involved in the decoration process, especially the brick area, wall paint area, wallpaper area and floor area; clarify the main wall size. Especially the wall size of furniture needs to be designed in the future

3. The demolition and renovation of the main body makes the space more practical

the demolition and renovation of the main body is the first project, mainly including wall demolition, wall building, wall peeling, heating, plastic steel window replacement, etc. The demolished and modified garbage should be cleaned out in time to ensure indoor cleanliness, which is also for the convenience of construction. At this time, it is time to fix the finished door. At this time, it is best to browse through the cabinets, range hoods, stoves and water heaters, and try to make sure

4. Water and electricity transformation, arrange the use of each space

water and electricity transformation is the most important link. We must determine the exact location of switches, lamps, basins, bathtubs, washing machines and so on. Before the water and electricity transformation, the cabinet designer should come to the door for the first measurement to help you determine the transformation plan of power supply and waterway. For the water heater, you'd better send someone to design the position of the power supply and the water supply and drainage interface according to the model you determine. Reminder: on the wall under the basin, it is best to leave a power socket for the convenience of installing kitchen treasures. The air conditioning hole and power supply should be placed on the wall at the head of the bed as far as possible to avoid the air conditioning blowing directly at people in the future. Strong electricity and weak points should be kept at a distance of 20 cm. For example, a distance of 20 cm should be left between the socket and the network cable

5. Wrap the riser, wrap the ugly pipe

considering the damp and humid environment in the kitchen and bathroom, the material of wrapping the riser must not be wood keel! Even if the wooden keel is painted with anti-corrosion paint, it will not work. Light steel keel or red brick is used for the riser. Light steel keel saves place, but the most solid and easy to use is red brick. At this time, you need to buy ceramic tiles, jointing agents, etc. Furniture should be ordered in advance, and the construction period should be kept well. It takes at least 15 days, generally more than a month. Reminder: don't wrap the pipe where there is an access hole. In case of water seepage, you can't find the reason

6. Tiling, the first thing with solid texture

before tiling, you should buy a floor drain. Reminder: the floor drain should be bought at the local supermarket. Buy a special washing machine or shower floor drain, and it should have anti odor function. After waterproof and roughening, prepare to stick bricks. Normal tiles should be soaked in water and dried in the shade before pasting; Broken tiles are left for cutting. Reserve an allowance before buying bricks. At this time, you should determine the water basin and faucet, and invite the cabinet designer to come to the door for the second time. At the same time, you should buy paint (mixed or clear), wall paint, nitro paint, diluted water, etc. if you stick wallpaper, you should also order it first

7. Oilers go to work, wash and brush

whether the wall is leveled, polished and rolled depends on the skill of painters. The good adhesion of primer can make the wall smoother, make the finish paint easier to brush, and reduce the use of finish paint. Moreover, the excellent sealing property of the primer can effectively resist the penetration of alkaline substances in the wall, prevent the precipitation of water-soluble salts, and prevent the wall from returning to alkali. Reminder: if the wall is to be painted with color, you must pay attention to the color matching. The color you bring out should be lighter than the color card, and it must not be the same as or deeper than the color card, because when you brush the wall with at least two coats of finish paint, some even three times, and the color of the wall will be deeper and deeper. Different people have different opinions on whether to spray paint or roll paint. The effect of spraying is better, but once there is damage, it will become extremely difficult to repair the paint

if you don't buy finished doors, let the worker master do it. Reminder: any carpentry work, even if it's just a pass, must follow this step. The big core board sinks to the bottom, and the decorative panel is veneered before painting. When mixing oil, it is absolutely wrong to brush oil directly on the big core board. Apply oil directly, and it won't be long before it will all crack. Now you don't need to brush when mixing oil, but spray it. Best, let the workers spray white on the inside of the door and the meter box together, which is not wasteful but beautiful

8. Wallpaper, beautiful walls

after the wall paint is brushed, the oil union will brush nitro paint on the place where the wallpaper needs to be pasted. The paint will dry out the next day, and then you can ask the master to paste the wallpaper. Reminder: do not open the window for ventilation within 48 hours after the wallpaper is pasted. Let it dry slowly in the shade. Tell the master that if there is warping in some places, please ask him to help repair it. At this time, it's time to buy panels, sockets and lamps

9. Install the socket panel

the socket panel can be installed in about half a day. It is best to buy a socket with switch function, especially in the kitchen, so that electric cookers and microwave ovens can be free from plugging in and out of the power supply, and can be controlled with a switch. Although the socket with switch is good, we should pay attention to its practicality. For the five hole power supply with switch, the three sockets are flat. Once your appliance needs round three sockets, there will be a depressing situation of empty sockets with plug boards. Therefore, multi-purpose socket must also be used, even if it is not controlled by a switch! At this time, you should buy the ceiling used in the bathroom and kitchen. If you need to install Yuba, please buy and install it in front of the ceiling

10. Seal the last ugly part of the kitchen and bathroom ceiling.

first install the water heater and Yuba. After installation, the edge sealing of the ceiling can better half pack the water heater, that is, more beautiful connection. It is best to buy aluminum gusset ceiling. Even if it is removed after many years, it is worth a lot of money to sell waste aluminum. The PVC gusset plate looks good, but its quality and performance are average. When buying gusset boards, ask the price of the whole package. Don't buy gusset boards separately. But the installation fee is extra

11. Install cabinets, and a beautiful overall kitchen is born.

cabinets are a matching project, and you should make an appointment in advance for range hoods, stoves and sinks. It's best to send it on the same day and install it together with the cabinet. Tell the cabinet factory in advance to bring the man-made stone countertop at the position of the cut stove and sink together

12. Install the finished door

the finished door should be installed before the floor, mainly because the door installation steps are complex, including hinges, door locks, door suckers, door frames, etc., and many tools are used. If the floor is installed first, bumps are difficult to avoid

13. For the installation of clothes hangers, curtain rods, lamps, sanitary ware and bathroom hardware, it is recommended to complete these items with a large amount of ash before installing the floor

14. Install the floor

the floor must be leveled before installation. Prepare a little pepper as insect killing powder in advance, and let the floor workers sprinkle it along the kick angle. In order to be neat, it is best to ask workers not to cut the floor in the house

15. Land reclamation and cleaning

the first is to clean the glass. The second is floor waxing. You need to buy the wax yourself. It's cheap and easy to use, but you must use a clean waxing machine, which is hundreds of times faster than manual work. Buy a bag of "five cleaning powder", use an old towel, dip it with dry five cleaning powder, and wipe it house by house from the pass to the door, from the tile to the kick corner